Companies contracting and factories

In factories and companies the load follows shifts rather than daylight, and the system is designed inside a facility whose roof and pipe network already exist.

Read the details

Companies, contractors and factories are the largest segment in the Aurora record and the most varied, spanning sanitary hot water for shift workers through to hot water that feeds the process itself.

The defining constraint is that the system is designed inside a facility that already exists: a roof with a known load capacity, an existing pipe network, and a delivery date tied to the main contractor schedule.

  1. 40projects delivered
  2. 285units installed
  3. 10governorates

Delivered projects

Open a project name to see the delivery details.

  1. Suez Canal Container Terminal (Maersk)
    Governorate
    Port Said
    Units
    10 units
  2. Redy Group
  3. Square Contracting
  4. Kabbani Furniture
    Governorate
    Cairo
  5. Alexandria Construction (Talaat Moustafa)
    Governorate
    Alexandria
  6. Awlad Hassan Allam
    Governorate
    Cairo
More projects +34
  1. Soma Bay Construction
    Units
    87 units
  2. Egyptian Company for Educational Projects Development (EgyGab)
    Units
    47 units
  3. Concept Contracting
    Units
    16 units
  4. Egyptian Arab Company for Electrical Industries
    Governorate
    Monufia
    Units
    15 units
  5. Travco
    Governorate
    Red Sea
    Units
    9 units
  6. Al Soheimy Contracting
    Units
    8 units
  7. Delta Contracting
    Units
    7 units
  8. Al Hekma Pharmaceuticals Factory
    Governorate
    Giza
    Units
    7 units
  9. Egyptian Company for Agricultural Development
    Governorate
    Beheira
    Units
    7 units
  10. Arab Contractors
    Units
    6 units
  11. Al Torki Contracting
    Governorate
    Matrouh
    Units
    6 units
  12. Bavi Contracting
    Governorate
    Alexandria
    Units
    6 units
  13. Al Rabeh Contracting
    Units
    5 units
  14. Al Madar Contracting
    Units
    5 units
  15. Global Energy
    Governorate
    Alexandria
    Units
    4 units
  16. Lines Contracting
    Units
    3 units
  17. Al Marasem Contracting
    Units
    3 units
  18. Sika Egypt Factory (Modern Building Chemicals)
    Governorate
    Cairo
    Units
    3 units
  19. Abraj Contracting
    Governorate
    Cairo
    Units
    3 units
  20. Pak Tex
    Governorate
    Alexandria
    Units
    3 units
  21. Protech General Supplies
    Governorate
    Cairo
    Units
    3 units
  22. Mobico Contracting & General Supplies
    Governorate
    Giza
    Units
    3 units
  23. United Builders Factory
    Governorate
    Sharqia
    Units
    2 units
  24. Deif Allah Contracting & Well Drilling
    Governorate
    Alexandria
    Units
    2 units
  25. Polygon Real Estate Investment
    Governorate
    Cairo
    Units
    2 units
  26. Al Salmaniya Real Estate Development
    Governorate
    Giza
    Units
    2 units
  27. Royal Herbs
    Units
    2 units
  28. Hafez Radwan Contracting
    Governorate
    Cairo
    Units
    2 units
  29. Afyal Contracting
    Units
    2 units
  30. Sidra Contracting
    Units
    1 unit
  31. Al Farouk Contracting
    Governorate
    Cairo
    Units
    1 unit
  32. Egyptian General Company for Buildings
    Governorate
    Asyut
    Units
    1 unit
  33. Royal Freight
    Governorate
    Cairo
    Units
    1 unit
  34. North Cairo Electricity Company
    Units
    1 unit

What makes an industrial or construction project different

  • A clear split between sanitary and process hot water, since each has its own target temperature, water quality and route.
  • Load follows shifts rather than daylight, so the peak draw can fall after sunset and storage is sized accordingly.
  • Roof load capacity and fixing routes are reviewed before any supply, so mounting is designed around the existing structure.
  • Tying into an existing boiler or steam network instead of replacing it, where that is the more economical route.
  • Phased handover with warranty documents and as-built drawings, so the package enters the owner project file.

Frequently Asked Questions

Can you install on a running factory without shutdown?

In most cases yes. Installation splits into a preparation phase outside the production path, covering bases, collectors and new pipework, and a short tie-in phase scheduled with plant management during planned downtime or between shifts.

The plant already has a boiler, so what does solar add?

The solar system acts as a pre-heat stage ahead of the boiler, so the boiler receives warmer feed water and runs for less time to reach the same target temperature. It is connected to the existing network rather than replacing it.

What documentation is handed over with the project?

An as-built system drawing, equipment data and model references, warranty terms, and a proposed preventive maintenance plan. That package is what lets any later service team work on the system.

Call Aurora01159100009WhatsApp Aurora