Integrated heating for villas and projects
Engineering-led load calculation and design · 12+ years of experience
Heat-load calculation, design, supply, installation and commissioning for underfloor, wall, radiator and towel-radiator systems.
We'll call you within an hour to review the project and book a study.
Comfort starts with room-by-room heat-load calculations, not guessed boiler or radiator quantities. Finishing stage, insulation, areas and controls determine the right system.

01
Who is it for?
- Villa or palace owner
- Finishing or MEP engineer
- Consultant or design office
- Project or procurement manager
- Developer or compound management
02
One system designed around the building
Aurora calculates loads, divides control zones and coordinates distribution with the finishing programme before supply, testing, balancing and commissioning.
Project delivery path
- 01
Heat-load calculation
Room areas, insulation, façades and use determine demand.
- 02
Design and coordination
Zones, pipe routes, heat source and controls are set before installation.
- 03
Supply and installation
Underfloor, wall or radiator systems are coordinated with finishing.
- 04
Balancing and commissioning
Circuits and controls are tested before handover and support.
03
Select the distribution method around the project

Underfloor heating
A concealed solution planned before flooring for balanced distribution.
View product
Wall heating and radiators
Visible room-based solutions selected around the finishing design.
View product
Towel radiators
Integrated into the heating system for bathrooms and towels.
View product
Room controls
Zones and controls are defined during design around actual use.
04
Reviewable engineering delivery
- More than 12 years in the Egyptian market
- Engineering team for loads and design
- Free assessment before quotation
- Approved system materials and products
- Approved warranty and after-sales service
- Projects line: 01000754786

05
Questions before installing heating
What determines system cost?
Area, loads, distribution type, heat source, control zones and finishing stage.
When is the best time to install?
Underfloor heating is easiest before flooring. Wall and radiator systems may fit other stages after assessment.
Does the site need to be ready?
We need plans or measurements and the finishing stage to define utilities and preparation.
How long does it take?
The programme follows load calculation, approved design and the finishing schedule.
Do you work outside Cairo?
Villa and project requests across Egypt are reviewed by location and scope.
What does warranty cover?
Coverage follows the approved components and quotation, with testing, handover and after-sales service.
06
Request a project study or quotation
Share the area, finishing stage and governorate so the projects team can review the case before calling.
Submitting creates a request for review and contact only. Sales qualification requires a connected call and human review.
Calculate the load before installation
Call the projects team on 01000754786 or submit the form on this page.

