What we delivered
- 2 × central gas hot-water system · Ariston · 3000 LHot-water systems
This project in context
Aurora delivered Hot-water systems on this project within the Hotels & hospitality sector in Cairo totalling 2 units.
In hotels the system is sized on the peak hourly draw rather than the daily average, so no room gets cold water at peak time.
In Cairo the roof is usually crowded with tanks and air-conditioning units, and the shade cast by neighbouring buildings is assessed before collector placement is decided.

