Central hot water for villas and projects
Approved brands, installed and commissioned by one team · 12+ years of experience
Capacity is selected around outlets, simultaneous demand and heating requirements, not the brand name alone.
We'll call you within an hour to review demand and book an assessment.
A villa or project boiler must handle peak demand safely. Bathrooms, outlets, ventilation and heating integration are all reviewed before supply.

01
Who is it for?
- Villa or palace owner
- Finishing or MEP engineer
- Project or procurement manager
- Developer or compound management
- Hotel or central hot-water facility
02
A central system, not a small appliance
Aurora reviews loads, gas, ventilation and pipe routes before selecting, connecting, testing and maintaining the central system.
A safe selection path
- 01
Demand assessment
Bathrooms, outlets, simultaneous use and heating demand.
- 02
Site review
Gas, ventilation, drainage, pipe routes and unit location.
- 03
Supply and installation
Connection to hot-water and heating distribution as designed.
- 04
Commissioning and service
Safety and performance tests, handover, warranty and after-sales service.
03
Available brands and project solutions

Ariston
Hot-water and heating boilers selected after reviewing actual demand.
View product
Bradford and Rheem
Available for central solutions according to model availability and project needs.

A.O. Smith and Americana
Approved supply alternatives selected on specification and the actual case.

Central storage capacities
Larger 150, 200 and 300 L options are reviewed against the available product and project demand.
04
Complete delivery by one team
- More than 12 years in the Egyptian market
- Engineering review of load and ventilation
- Free assessment before selection
- Approved brands and products
- Installation, commissioning and maintenance
- Warranty and after-sales support

05
Questions before buying a central boiler
How is capacity selected?
By bathrooms, simultaneous outlets and whether the boiler also serves heating.
What determines price?
Brand, model, capacity, preparation, pipe routes, ventilation and installation scope.
What site preparation is needed?
A suitable gas source, ventilation, drainage, installation space and water routes.
How long does installation take?
It depends on gas and pipe readiness and system size; the programme is confirmed first.
Where is service available?
Villa and project requests across Egypt are reviewed by governorate, area and scope.
Is maintenance and warranty included?
Yes, according to the approved brand, model and supply-and-installation scope.
06
Request a boiler assessment
Share bathrooms, expected demand and whether heating is required.
Submitting creates a request for review and contact only. Sales qualification requires a connected call and human review.
Capacity starts with demand
Call sales, use WhatsApp, or submit the assessment form on this page.

