What we delivered
- 3 × boiler · Bradford · 300 LBoilers
This project in context
Aurora delivered Boilers on this project within the Public projects & institutions sector in Cairo totalling 3 units.
In institutions the work starts by surveying the existing network before any design, because a new system on corroded pipework inherits the problem instead of solving it.
In Cairo the roof is usually crowded with tanks and air-conditioning units, and the shade cast by neighbouring buildings is assessed before collector placement is decided.

