What we delivered
- 3 × boiler · Ariston · 300 LBoilers
This project in context
Aurora delivered Boilers on this project within the Hospitals sector in Cairo totalling 3 units.
In hospitals service continuity is a design requirement: parallel units with a standby auxiliary source, so maintenance never stops the hot water.
In Cairo the roof is usually crowded with tanks and air-conditioning units, and the shade cast by neighbouring buildings is assessed before collector placement is decided.

